Chatham University

Eden Hall Campus Wastewater System

CME was contracted by Chatham University in the fall of 2014 to serve as the Certified Wastewater Operator on a circuit rider basis. CME provides operations and troubleshooting for start up and operation of the newly constructed Eden Hall Campus field lab. The wastewater treatment facility is a 6,000 gpd system serving the campus and integrating water recycling and constructed wetlands as part of an eco-friendly design.

Services offered:

  • System startup
  • Licensed operation
  • System troubleshooting
  • System maintenance and repair